How Much Does It Cost to Build a House in Cabarete in 2026?

Short answer: In 2026 we quote about US$800 per m² for grey work (the structure) and about US$1,200 per m² for a turnkey house, materials included. Plans and permits are quoted separately. These are starting references, not fixed prices: the final number depends on the design, the soil, the lot and the finishes you choose. A 200 m² turnkey house at that reference comes to about US$240,000 in construction alone, before land, plans, permits, pool and furniture.

Key takeaways

  • Grey work ≈ US$800/m², turnkey ≈ US$1,200/m² (Saiz Solutions, 2026, materials included).
  • Plans and permits are quoted separately.
  • Design, soil, slope, access and finishes move the price more than the size does.
  • Official data: direct housing construction costs in the DR rose 6.42% in the 12 months to August 2026, driven by labour (ONE via Revista Mercado).
  • The only real price is a quote for your plans and your lot.

What does it cost per square metre to build in Cabarete?

These are the references we use in Cabarete, Sosúa and Puerto Plata in 2026. Our prices include materials: we buy everything the build needs.

Type of workWhat you getReference price (2026)
Grey work (obra gris)Foundation, columns, beams, block walls, slabs or roof structure. No finishes.From about US$800 per m²
Turnkey (llave en mano)The finished house: plaster, floors, bathrooms, kitchen, doors, windows, electrical and plumbing, paint.From about US$1,200 per m²
Plans and permitsArchitectural and engineering plans, municipal licence and approvalsQuoted separately

Prices vary with the type of construction. They are a starting point to plan a budget, not a quote.

If you want the difference between the two explained step by step, read grey work vs turnkey construction.

How much does a 150, 200 or 300 m² house cost?

Using the 2026 references above, construction only:

House sizeGrey work (≈ US$800/m²)Turnkey (≈ US$1,200/m²)
100 m²≈ US$80,000≈ US$120,000
150 m²≈ US$120,000≈ US$180,000
200 m²≈ US$160,000≈ US$240,000
300 m²≈ US$240,000≈ US$360,000

These numbers are a reference to plan with. A simple house with local finishes can come in near the reference. A villa with large glass openings, double-height ceilings, imported finishes or a difficult lot will come in above it.

Why “it depends” is the honest answer

Clients often ask us for one price per m². We give a reference, but two houses of the same size can cost very different amounts. These are the things that move the number most:

FactorWhy it changes the price
Design and styleLarge spans, cantilevers, double heights and many corners need more steel, concrete and formwork. A compact, simple shape costs less per m².
SoilSand, fill or high groundwater near the coast can mean deeper or wider foundations. Rock or clay inland changes the excavation.
Slope and accessA sloped lot needs retaining walls and earthwork. If concrete trucks and pumps cannot reach the site, materials move by hand and the day costs more.
Number of storeysA second floor adds structure, stairs and scaffolding, but shares the roof and foundation.
FinishesLocal ceramic and standard fixtures versus imported porcelain, natural stone, custom carpentry and designer fittings. This is where budgets grow fastest.
Windows and doorsStandard aluminium versus impact-rated systems. See hurricane-resistant construction.
RoofA waterproofed concrete slab, a terrace roof or a pitched wood roof each have a different cost.
Owner changes during the buildMoving walls, openings or outlets after they are built is one of the main causes of extra cost and delay we see.

That is why we ask for your plans (or your idea) and your lot location before giving a real number.

What is not included in the price per m²?

The price per m² covers the house. Plan a budget line for each of these:

Why construction costs keep rising in the Dominican Republic

The National Statistics Office (ONE) publishes the Housing Direct Construction Cost Index (ICDV) every month. According to its August 2026 report, as reported by Revista Mercado:

  • direct construction costs rose 4.22% in one month and 6.42% year on year;
  • labour (carpentry, electrical, masonry, excavation, plumbing and day labourers) rose 12% in the month;
  • materials rose only 0.61%.

In 2025, labour was also the component that pushed the index most (elDinero). In practice this means a quote has a shelf life. If you are planning to build, it helps to lock the price and the schedule in a written contract.

Note: the ICDV is measured for the Santo Domingo area; costs on the north coast follow the same trend but are not identical.

How we quote a house

  1. You send us your plans or your idea and the location of the lot.
  2. We visit the lot to see access, slope and soil.
  3. We give you a written quote with what is included and what is not. Plans and permits are quoted separately.
  4. Payments: the first payment is the largest because it buys the materials; the rest is paid during the work and at handover. We accept transfers in US dollars from abroad.
  5. Every week you get photos, videos and a call, wherever you live. About 90% of our clients live outside the Dominican Republic.

A mid-size villa usually takes about 8 months of construction. See how long it takes to build a villa.

Get a real number for your project

Saiz Solutions Builders has been building and remodelling on the north coast since 2019, with more than 100 projects in Cabarete, Sosúa and Puerto Plata. Send us your plans or your idea and your lot location and we will give you a written quote. Or message us on WhatsApp.

FAQ

How much does it cost to build a house in the Dominican Republic?

On the north coast in 2026, Saiz Solutions quotes about US$800 per m² for grey work and about US$1,200 per m² turnkey, materials included. Plans and permits are quoted separately. The final price depends on the design, the soil, the lot and the finishes.

How much does a 200 m² house cost to build in Cabarete?

At the 2026 references, about US$160,000 for grey work or about US$240,000 turnkey, construction only. Land, plans, permits, pool and furniture are extra.

Why can’t a builder give an exact price per m²?

Because style, design, soil type, slope, access and finishes change the cost more than the size. Two 200 m² houses can have very different budgets. A real price needs plans and a site visit.

Does the price include materials?

Ours does. We buy all the materials the build needs, which is why the first payment is the largest.

Are construction costs going up in the Dominican Republic?

Yes. The ONE’s housing construction cost index rose 6.42% in the year to August 2026, mainly because of labour.

Is it cheaper to buy or to build?

It depends on the location and what you want. See buying vs building a house in the Dominican Republic.