Short answer: Grey work (obra gris) is the structure of the house: foundation, columns, beams, block walls and slabs, with no finishes. Turnkey (llave en mano) is the finished house, ready to move in. In 2026 we quote about US$800 per m² for grey work and about US$1,200 per m² turnkey, materials included, with plans and permits quoted separately. Grey work costs less up front, but you then manage the finishes yourself, which is hard if you live abroad.
Key takeaways
- Grey work = structure only. Turnkey = finished and ready to live in.
- 2026 references (Saiz Solutions): grey work ≈ US$800/m², turnkey ≈ US$1,200/m², materials included.
- Grey work makes sense if you will finish in stages or with your own team.
- Turnkey makes sense if you live abroad or want one contract, one schedule and one person responsible.
What is grey work (obra gris)?
“Obra gris” is the Dominican term for the grey, unfinished structure, the colour of bare concrete and block. It usually covers:
- site layout and excavation;
- foundation (footings and ground beams);
- columns, beams and block walls;
- slabs for floors and roof, or the roof structure;
- stairs in concrete;
- often the openings for doors and windows, and the conduits for electrical and plumbing set in the walls.
What grey work does not include: plaster and render (in many contracts), floors and tiles, bathrooms, kitchen, doors, windows, fixtures, paint and the final electrical and plumbing.

Always ask for the list. “Obra gris” does not mean exactly the same thing to every builder. Some include plaster, some include the roof waterproofing, some do not. Get it in writing.
What is turnkey (llave en mano)?
Turnkey means you receive the keys to a finished house. On top of the grey work, it includes:
- plaster and render, inside and out;
- floors and wall tiles;
- bathrooms and kitchen;
- doors and windows;
- electrical and plumbing finished and tested;
- roof waterproofing;
- paint.
Pool, landscaping, furniture and appliances are usually separate items. Ask what your quote includes.
Grey work vs turnkey: side by side
| Grey work (obra gris) | Turnkey (llave en mano) | |
|---|---|---|
| What you receive | The structure | A finished house |
| 2026 reference (Saiz, materials included) | From about US$800/m² | From about US$1,200/m² |
| 200 m² house, construction only | ≈ US$160,000 | ≈ US$240,000 |
| Who manages finishes | You | The builder |
| Number of contracts | At least two | One |
| Time to move in | Longer (finishes come after) | About 8 months of construction for a mid-size villa |
| Best for | Owners who live here, build in stages, or have their own finishing team | Owners abroad, investors, people who want one responsible party |
Prices vary with the type of construction. Plans and permits are quoted separately.
When does grey work make sense?
- You want to build in stages. You close the structure now and finish when the budget allows. A closed, waterproofed structure can wait.
- You live near the site and can choose and supervise finishes yourself.
- You already have a finishing team you trust.
- You plan a second storey later. Building the structure for it now (and leaving it in grey) avoids demolition later. See our Spanish guide on building a second floor.
The risk: the cheapest part of the job is done and the hardest part to coordinate is still ahead. Finishes are where budgets grow, where delays pile up and where mistakes are most visible.
When does turnkey make sense?
- You live abroad. About 90% of our clients live outside the Dominican Republic. For them, coordinating tile, carpentry, plumbers and electricians from another country is not realistic.
- You want one price and one schedule for the whole house.
- You want one party responsible if something is wrong at handover.
- You are building to rent. A turnkey contract gets the house earning sooner.
See building a house in the Dominican Republic from abroad.

What makes either price go up or down?
The same factors affect both: the design and style, the soil, the slope and access to the lot, the number of storeys and, for turnkey, the finishes you choose. Local ceramic and standard fixtures keep the turnkey price close to the reference. Imported stone, custom carpentry, large glass walls and designer fittings push it up. More in our 2026 cost guide.
Get a quote for grey work or turnkey
We build both in Cabarete, Sosúa and Puerto Plata, and our prices include materials. Send us your plans or your idea and your lot location and we will quote it either way, so you can compare. Or message us on WhatsApp.
FAQ
What does obra gris mean?
Obra gris (grey work) is the structure of a house without finishes: foundation, columns, beams, block walls, slabs or roof structure. Floors, bathrooms, kitchen, doors, windows and paint are not included.
What does llave en mano mean?
Llave en mano (turnkey) is a house delivered finished and ready to live in, with floors, bathrooms, kitchen, doors, windows, installations and paint.
How much is grey work per m² in the Dominican Republic?
Saiz Solutions quotes from about US$800 per m² for grey work in 2026, materials included. The price varies with the type of construction.
How much is turnkey construction per m²?
Saiz Solutions quotes from about US$1,200 per m² turnkey in 2026, materials included. Plans and permits are quoted separately.
Is it cheaper to build grey work and finish later?
The first payment is lower, but the total is not always lower. Finishing later means more contracts, more coordination and often more time. It works best if you live near the site.