Short answer: Start with what protects the house, not with what looks nice. On the north coast that means, in this order: roof and waterproofing, water and drainage, electrical, windows and doors, then bathrooms, kitchen, pool and finishes. Salt air, humidity and heavy rain are hard on buildings, and a villa that looks fine in photos can hide leaks, corroded steel and tired installations. Inspect first, then renovate in an order that does not force you to redo work.
Key takeaways
- Order: roof → water and drainage → electrical → windows → bathrooms and kitchen → pool → finishes.
- Inspect before you buy, if you still can, and get a renovation quote before closing.
- A bathroom remodel takes us about 12 days and costs about US$6,000–12,000.
- Many of our renovation clients live abroad; we report every week with photos and video.
The inspection checklist
Walk the house with a builder, ideally after rain. This is what we look at:
| Area | What to look for |
|---|---|
| Roof | Stains and mould on ceilings, standing water, cracks at parapets and drains, peeling coating, rusted fixings on metal roofs |
| Structure | Cracks in beams and columns, exposed or rusted steel (especially on terraces and balconies), spalling concrete |
| Water | Cistern condition, pump age and pressure, leaks, water stains at the base of walls |
| Drainage and septic | Slow drains, smells, where the septic tank is and when it was emptied |
| Electrical | Panel age and capacity, mixed or burnt wiring, outlets without ground, backup system (inverter, generator) |
| Windows and doors | Corroded aluminium, broken seals, water coming in during rain, hurricane protection |
| Bathrooms | Loose or hollow tiles, mould, leaks to the floor below, low pressure |
| Kitchen | Cabinet damage from humidity, termites, worn counters, old appliances |
| Pool | Rough or stained finish, water loss, old pump and filter, cracked deck |
| Wood | Termites in roofs, pergolas, doors and furniture |

The renovation order that saves money
- Roof and waterproofing. Everything under a leaking roof will be damaged again. See roof types and waterproofing.
- Structural repairs. Terraces, balconies and railings with exposed steel get worse every season.
- Water, drainage and septic. Fix pipes before you lay new tile over them. See water, power and septic.
- Electrical. New panel and wiring before closing walls and painting.
- Windows and doors. They protect the new interior from rain and storms.
- Bathrooms and kitchen. The rooms that change daily life most. See bathroom remodel cost.
- Pool. New finish and equipment. See pool construction and renovation.
- Floors, paint and finishes. Last, so they are not damaged by the rest of the work.
What it costs and how long it takes
Every villa is different, so we quote after a visit. Two references from our work:
- Bathroom remodel: about US$6,000–12,000, about 12 days, materials included.
- Pool: about 30 days to build a new one.
For a full renovation of a villa, the scope decides the price: a roof and paint job is a very different project from new bathrooms, kitchen, windows and electrical. Our prices include materials.

Renovating to rent
If you bought the villa to rent it, a few choices make a big difference in maintenance:
- finishes that resist humidity and heavy use (porcelain floors, quartz counters, stainless or coated fittings);
- reliable backup power and water, because guests notice cuts first;
- air conditioning sized for each room, with the panel to carry it;
- simple, repairable fixtures you can find locally.
Renovating from abroad
About 90% of our clients live outside the Dominican Republic. Every week they get photos, videos and a call, and we buy all the materials, so they do not have to. See managing a build from abroad.
Get your villa inspected and quoted
Send us the villa location and a few photos and we will arrange a visit, or message us on WhatsApp. We work in Cabarete, Sosúa, Sea Horse Ranch and Puerto Plata.
FAQ
What should I renovate first in an old villa?
The roof and waterproofing, then structural repairs, water and drainage, and electrical. Bathrooms, kitchen, pool and finishes come after, so new work is not damaged.
How much does it cost to renovate a villa in Cabarete?
It depends on the scope. As references, a bathroom remodel with Saiz Solutions costs about US$6,000–12,000 and takes about 12 days, materials included. A full renovation is quoted after a visit.
What are the most common problems in north coast villas?
Roof leaks, rusted steel in terraces and balconies, corroded windows, tired bathrooms, old electrical panels and worn pool finishes, mostly caused by salt air, humidity and rain.
Should I inspect a villa before buying it?
Yes. Walk it with a builder, ideally after rain, and get a renovation quote before closing.
Can you renovate while I am abroad?
Yes. Saiz Solutions sends photos, videos and a call every week, and buys all the materials.