¿Cuánto cuesta remodelar un baño en 2026? Precio, tiempo y qué incluye

Short answer: In 2026, a full bathroom remodel with Saiz Solutions costs between about US$6,000 and US$12,000, materials included, and takes about 12 days of work. Where a bathroom falls in that range depends on its dimensions, the finishes and the style of tile you choose. Moving the toilet or the shower drain, or fixing hidden water damage, can add to it.

Key takeaways

  • Range: about US$6,000–12,000 per bathroom (Saiz Solutions, 2026, materials included).
  • Time: about 12 days of work.
  • The size, the finishes and the tile drive the price.
  • Waterproofing under the tile is the part you do not see and the one that matters most.

What is included in a bathroom remodel?

A full remodel usually covers:

  • removing the old tile, fixtures and, if needed, the plaster;
  • plumbing: new supply and drain lines where needed, valves;
  • waterproofing of the shower area and floor before tiling;
  • floor and wall tile;
  • shower: tray or tiled floor with slope to the drain, glass screen;
  • toilet, sink and vanity, taps and shower set;
  • electrical points, lighting and ventilation;
  • paint and final cleaning.

Ask for this list in your quote, so you know what is in and what is out.

Remodelled bathroom with a glass shower screen and new tile in a villa in Cabarete.

What makes a bathroom cost US$6,000 or US$12,000?

FactorLower endHigher end
SizeSmall guest bathroomLarge main bathroom with double vanity
TileLocal ceramic, standard sizesLarge-format porcelain, natural stone, mosaics, tile to the ceiling
ShowerStandard tray and screenWalk-in shower with tiled floor, linear drain, frameless glass
FixturesStandard taps and toiletDesigner taps, rain shower, wall-hung toilet
LayoutSame layoutMoving the toilet, shower or sink (new drains)
Hidden damageNoneLeaks, rotten wood or damaged pipes found when opening walls

How long does a bathroom remodel take?

About 12 days of work for a typical bathroom. Things that add time:

  • tile or fixtures that are not in stock and have to be ordered;
  • hidden damage found during demolition;
  • changes after the work has started.

If you are remodelling several rooms, the bathroom can run in parallel with other work. See our complete guide to home remodelling in Cabarete.

Why bathrooms leak on the north coast, and how to avoid it

Most problems we see when we open an old bathroom come from the same causes:

  • no waterproofing under the shower tile, or a broken one;
  • too little slope to the drain, so water sits on the floor;
  • cheap fittings that corrode with humidity and salt air;
  • no ventilation, so moisture stays in the walls and mould appears.

A good remodel fixes the cause, not only the look. That is why we waterproof before tiling and test the plumbing before closing the walls.

Bathroom with a wood-look shower wall and modern fittings, remodelled on the north coast of the Dominican Republic.

Remodelling while you live abroad

Many of our clients are not in the country while we work. We send photos and videos every week and have a call to review progress, and our price includes materials, so you do not have to buy anything yourself. See managing a build from abroad.

Get a quote for your bathroom

Send us photos of your bathroom, its approximate size and what you want, or message us on WhatsApp. We work in Cabarete, Sosúa and Puerto Plata.

FAQ

How much does it cost to remodel a bathroom in the Dominican Republic?

With Saiz Solutions on the north coast, a bathroom remodel costs about US$6,000 to US$12,000 in 2026, materials included, depending on dimensions, finishes and the style of tile.

How long does a bathroom remodel take?

About 12 days of work for a typical bathroom. Ordered materials, hidden damage or changes can add time.

Is the price with materials?

Yes. Saiz Solutions prices include materials; we buy everything the job needs.

Can I keep using the house during the remodel?

Usually yes, if there is another bathroom. We protect floors and walls in the rest of the house while we work.

What is the most important part of a bathroom remodel?

The waterproofing under the tile and the slope to the drain. They are invisible once finished, and they are what prevent leaks.

Deja un comentario

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *

Scroll al inicio